The process of vacuum casting in prototype factory

Time:2013-03-12 15:56 source: Leecheer Author: Leecheer Click:
1.Preheating the silicon mould .Heat the silicon mould to 60-70 centigrade in advance.
2.Deaeration castable .Respectively put A, B two fluid in the chamber for vacuum deaeration 
treatment by more than 30 minutes.
3.Pouring.Place the A and B liquid containers in operation room respectively.After getting the
 vacuum in operation room ,stir B fluid constantly,to make it deaeration for 5-10 minutes,then 
pour A liquid into B liquid, after mixing 30 to 40 minutes, quickly poured into the silicon rubber 
mold.Within 1 min to 1.5 min to reply to the operation of atmospheric pressure since the 
beginning of mixed.
4.Solidify.Demould after curring in the constant temperature box with temperature 60-70 
centigrade by thirty to sixty minutes .Make second curring in 70-80 centigrade constant 
temperature box by two to three hours if necessary.
5.When preheat the silicon mould,if the mould temperature is too low, will cause the curing 
incomplete, poor physical properties, mold temperature is directly related to the dimension 
precision of trial production.






 
Keywords: The,process,vacuum,casting,prototype,factory, 
Copyright © 2012-2016  HongKong Leecheer Prototype Manufacturing Limited  www.chinaprototyping.com
skype:prototype6003 Email:leecheer@chinaprototyping.com 
Keywords: prototype manufacturers,china prototyping,prototype companies,sla prototype,cnc prototype china,sls prototype,vacuum casting proess,short run production,rapid sheet metal.functional prototype,appearance prototype,Transparent prototype,Aluminum prototype