The transparent according the drawing required material to make, and the wall
need to be smooth, cannot have machine processing knife grain.
5.The plastic structure flexible and can be used as whole product.
6.The designers shoulder cooperate with workers before prototyping production.
7.The designed product shoulder confirmed, forming technology and process
won’t be modified the finalize design because of parts processing
8.Early to do processing to prevent haste consideration to affect time limit for
a project.
9.Need to consider the paint thickness whether different with the drawing
required size before spraying the prototype.
10.Need to consider the rough process and accuracy process before processing,
to prevent the cracking , the internal and external different heart and the processing
texture in product appearance.
11.Adopt the correct material before the parts processing,prototype workers help
to revise the structure parts under high temperature and low temperature changes.
12.There is personnel measure and assemble after every prototype parts
processed, and there is personnel to help revise if something wrong with design,
and then reprocess the prototyping group after review.